Two numbers decide whether a repaint on a skid steer or an excavator lasts. One is how clean the steel is when the primer goes on. The other is how rough it is, which the trade calls the profile. Neither shows up in most quotes, and both are the reason a repaint looks fine at the auction and peels along every edge the following summer. This guide covers the standard to name, the profile a primer needs, how a machine splits into zones, and the primer window Wake County weather keeps short.
How clean: the standards you can name
The coating trade grades blasted steel by how much of the old coating, rust and mill scale is allowed to remain. The two you will see on a data sheet are SSPC-SP 6, also called NACE No. 3 or commercial blast, and SSPC-SP 10, NACE No. 2 or near white blast. Commercial blast allows light staining from rust or old coating on up to a third of each nine square inch patch of steel. Near white allows staining on no more than five percent of it. Both remove every bit of loose material; the difference is the shadow left in the pits and low spots.
For a machine repaint, commercial blast is the working standard. It is what most industrial primers list as the minimum and what a skid steer at $900 to $1,800 or a 12 to 25 ton excavator at $2,400 to $4,500 on our price table buys. Near white is a plant or bridge specification with an inspector attached, and asking for it on a counterweight roughly doubles the passes for a difference nobody will measure. If a painter or a fleet program hands you a spec that names SP 10, tell us before the day so it is quoted on the hourly line and run with media that holds the number.
How rough: what a profile is and what the primer wants
Blasting cuts a pattern of peaks and valleys into bare steel. The depth of that pattern is the profile, measured in mils, thousandths of an inch. Primer bonds by locking into it. Most rust inhibitive primers used on equipment ask for somewhere between one and a half and three mils, and high build epoxies tolerate up to about four. Under that and the coating has nothing to grip. Over it and the peaks stand proud of a thin primer, rust first, and lift the coat from underneath.
The profile is set by the media and the pressure, not by how long the nozzle sits on one spot. Coal slag at full pressure lands in the two to four mil range on plate, which is why it is the default on machine steel. Crushed glass runs lighter. Garnet holds a number from bag to bag, which is what a measured spec wants and a bush hog does not. Our guide on blast media for heavy equipment goes through those trades in detail.
If a job needs the number proven, the field method is replica tape pressed into the blasted surface and read with a spring micrometer, per ASTM D4417 method C. That is inspector work and it belongs on a spec job. On a yard repaint the check is simpler: the primer data sheet names a range, the media is chosen to land inside it, and the steel is blasted to commercial before anything goes on.
A machine is five different surfaces
A skid steer is a thick welded frame with loader arms hung on it and thin sheet bolted around it. An excavator is a boom, a stick and a counterweight of heavy plate with a cab of sheet metal and an undercarriage full of parts that must not be blasted at all. Treating the whole thing as one surface is how hoods get warped and how track rollers get a seal kit.
| Zone | What it is | How it gets blasted |
|---|---|---|
| Loader arms, quick attach, frame rails, counterweight, boom, stick, dipper | Thick plate. Takes a deep profile without complaint. | Coal slag at full pressure. Deep, coarse profile for a high build primer. |
| Bucket, cutting edge side plates, dozer blade, ripper | Thick, but wear faced. Old hardfacing and gouges are normal. | Slag, blasted clean but not chased. Gouges get primer, not filler. |
| Hood, side doors, rear door, cab sheet metal, fenders | Thin sheet. Warps if hit like plate. | Lower pressure, finer media, lighter profile. The topcoat needs a smooth base here. |
| Track frames, belly pans, undercarriage guards | Plate, but packed with clay and often the rustiest steel on the machine. | Clay out first. Then slag. Rollers, idlers, sprockets and final drives are masked, never blasted. |
| Cylinder rods, hoses, fittings, glass, data plates, wiring | Not steel you coat. | Masked. Nothing touches them. |
The rows that cost money are the first and the fourth. Loader arms and booms are where the old paint is thickest and the scale is deepest, and a 12 to 25 ton excavator lands at the top of its range when the counterweight has years of layered rust. Track frames land there when the clay has never been dug out. Both are things you can look at in your own yard before you send photos.
What the factory did, and what a repaint can do
A new machine left the plant with an electrocoat or powder primer baked on in a booth and a urethane top over it. A field repaint cannot repeat that. What it can do is put a clean, profiled surface under a rust inhibitive primer and a urethane topcoat, which on thick plate holds for years and on sheet metal holds as long as the painter respects the thinner profile. That is the finish we quote, a field repaint built to last, not a copy of the factory booth.
The primer window
Bare steel at commercial blast is as reactive as steel gets, and around Apex it starts to flash rust within hours of the last pass. The primer has to go on the same afternoon, while the steel sits at least five degrees above the dew point and before the evening cool down. That is why same day primer is its own line, $300 to $1,200 by machine size, and why bare steel left overnight is a machine that needs blasting again. The full sequence, from the wash the afternoon before to holding a primed machine until paint day, is in the guide on prepping and recoating in North Carolina humidity.
What goes on our quote
Three lines. Blasted to SSPC-SP 6 commercial on all coated steel. Profile inside the range the primer data sheet names, with the media stated. Rust inhibitive primer applied the same day. Those three lines are what stand between you and doing the job twice. Send photos of the machine and we send the number.
Send photos, get the number
Three or four photos, the make and model, and where the machine sits. The quote comes off the published table, and if the photos show steel that needs a welder first, we say so.
Questions this guide gets asked
What blast profile does a skid steer need before repainting?
Whatever the primer data sheet names, usually between one and a half and three mils on plate. Coal slag at full pressure lands in that range on loader arms and the frame. Hood and door sheet metal gets a lighter media at lower pressure so it does not warp.
What is SSPC-SP 6 and is it enough for an excavator repaint?
SSPC-SP 6, also called NACE No. 3 or commercial blast, removes all loose rust, scale and coating and allows light staining on up to a third of each nine square inch patch. It is the minimum most industrial primers list and the right standard for a machine repaint. Near white, SP 10, is a spec job with an inspector.
How long can blasted steel sit before primer?
Hours, not days, around Apex. Bare steel flash rusts the same afternoon in summer humidity. Primer goes on the same day while the steel is at least five degrees above the dew point, which is why same day primer is its own line at $300 to $1,200 by machine size.
More guides under guides, the full price table, or your town page under service area.